Every element you make will outlive you. Your proof should too.
CONQA is construction quality assurance software built on proof: for precast, a permanent, independent record for every element you make, of what it is, who made it, and that it was made right. The day an element is questioned – next year or in year forty – your name is already protected.
The record has to last as long as the element.
A precast element goes into a bridge, a tower, a foundation, and it’s there for decades. The record that proves it was made right is a stack in a tray, a photo on a phone, a spreadsheet one wrong click from lost.
One precaster had a stamp made because signing pre and post-pour checks by hand was wearing their wrist out, the stack in the tray a foot deep. Jobs get backfilled from memory, weeks after the pour, from photos saved under the wrong job.
“Somebody deletes that Excel file by accident and it disappears into the ether. Then you’ve got nothing.”
– A precast manufacturer
You’re protecting a product that outlives everyone who made it with a record that lasts until someone loses the folder.
Precast QA software builds the record while your team checks.
Your team already checks everything: the pre-pour, the post-pour, the lifters, the strand. What CONQA changes is that the record builds itself while they do, evidence captured at the point of work, tied to the specific element, signed off as it happens. Nothing is written up later, because later is where records go wrong.
Pre-pour and post-pour checks captured at the element, as the work happens.
200 → 15
Records behind at any one time, before and after CONQA.
Twelve years of paper checks, three to thirty signatures each, cleared on weekends. Now cleared on a phone between meetings.
Mike Savage, Fraserway Prekast
The record-keeping breaks before the checking does.
A claim gets queried, or a client rings about an element that went into the structure years ago. Someone has to pull that whole job back out – every check, every pour date, every sign-off – and hand it over in a form the other side will accept. That’s the first real test the spreadsheet has ever sat.
Move while the spreadsheet still works.
A record that doesn’t depend on the person who built the spreadsheet.
What precasters told us.
“You put all the effort in up front and so you want all the evidence”
– Guy Quaife, Director, Precast HQA precast manufacturer was asked for a PS3 producer statement and had nothing to show: no photos, no records. Today every element is QA’d as it’s made.
A precast and steel manufacturer shows clients the QA system at departure stage, setting the standard before the client asks for it.
It isn’t the counting that costs you. It’s the panel someone questions in year eight.
A disputed element is yours to own, no matter whose fault it was. Unless the record was already there.
A defect gets questioned in year eight. Fault barely matters at that distance, because the argument goes to whoever can show what was done. The people who poured it have moved on. The element hasn’t.
“There’s lines out there that my initials are on paperwork and they’re buried in the ground with oil flowing through them until the end of time.”
– QC tech, precast manufacturerThe lag has a price, and you’re already paying it.
A pre-pour sign-off that comes late is a batch you can’t use. Falling behind means work redone that was fine the first time. Every precaster we spoke to had rework in the last twelve months from a record that arrived after the work did.
“We pour at noon, but the concrete delivery has to be cancelled by eleven. If the engineer’s sign-off comes late, that’s thousands of dollars of concrete we can’t use.”
– Operations Manager, precast manufacturerNothing moves to the next step without a record that says it’s cleared.
The pour that goes ahead because nobody said stop. The element that ships before it was signed off, found when it’s craned into position with a client watching. Same gap, different price. Every element carries its own live status, so the person about to pour it or load it can see where it stands before they commit, not after.
“You don’t want to find out a piece wasn’t signed off when it’s already hanging off a crane on someone else’s site.”
– Production manager, precast manufacturerYour QA system is part of your pitch, whether you meant it to be or not.
A client asks for element-level certification for the first time and you find out what you can actually show. Get in front of it and you set the bar rather than scrambling to meet someone else’s.
“We give the client a heads up that this is the system we use. So we set the standard.”
– Commercial manager, precast manufacturerCommon questions
Why change from the system we already have?
Because the risks a working system carries never show up in daily use. A production spreadsheet can run for years and still leave you with nothing to show the day a client questions an element already in the structure, and its accuracy usually depends on the one person who built it. CONQA puts the record on a footing that depends on neither, and keeps it retrievable for the life of the element.
What does CONQA do for precast manufacturers?
CONQA is construction quality assurance software built on proof. Crews capture pre-pour and post-pour checks, photos and sign-offs at the point of work, tied to the specific element. That builds a permanent, independent record for every element you make: it supports the monthly claim, answers the QA question at tender, gives dispatch a clean cleared-to-ship signal, and protects your name if the element is ever disputed.
Does CONQA replace our ERP, scheduling system, or production spreadsheets?
No. CONQA is the independent QA record and runs alongside your ERP, scheduling system and production spreadsheets rather than replacing them. The record stands apart from the systems that run production on purpose: it survives changes to any of them, and it is exportable in full.
Who owns the QA record, and what happens to it when the job ends?
The record belongs to you. It is permanent, retrievable and exportable in full, so the proof outlives the project, the file, the person who made it, and the software contract. That matters when the element itself is in service for decades.
How much does CONQA cost?
CONQA starts at $899 a month for precast manufacturers. Pricing scales with the size of your operation – there’s no per-user charge, so everyone who needs to see the record gets access. Book a demo and we’ll give you a firm number for your yard.
Your name is on every element you pour. Keep the proof it was done right.
See the record an element carries for life.