The record, in their words. Money released. Names protected. Work won.
These are the people who did the work and can now show it: claims released, disputes answered, tenders won on the strength of the record.
96→32
The site-remediation list, nine months after the floor started photographing its own work.
“We caught a problem before it was a problem on site.”
Hayden, Commercial Production Manager See the Windows & Doors page
$28k
Saved a year, with record reconstruction switched off.
The record used to be rebuilt at month-end from photos and memory. Now it assembles as the work happens.
Read the story
80%
Reduction in rework, by catching issues while they were still cheap to fix.
Defects were found late, when fixing them meant going back into finished work. Moving the check to the point of work cut the list to a fifth.
Read the story
10wks
Ahead of schedule on a $100m apartment block.
On a build that size, QA sign-off is usually what everything else waits behind. Here the record kept pace with the work.
Read the story
Every customer story.
Civil, precast, manufacturing and the trades.
- Fulton Hogan Progress on a major airport build demonstrated as it happened, in a live record the client could see. Civil →
- Downer Stopped paying qualified engineers to do administrative work. Civil →
- Higgins ITPs and QA records in one place, open on any device, with no chasing paper across sites. Civil →
- Direct Drains Around $28,000 saved with digital QA. Civil →
- Precast HQ All the effort goes in up front, so the evidence is captured with it, element by element. Precast →
- Hudson Civil A record for every element travels with it, from the yard into someone else’s build. Precast →
- Kalos Windows & Doors Site remediation jobs down from 96 to 25 in nine months. Manufacturing →
- Viridian When glazing is questioned after install, the record shows how it left the factory. Manufacturing →
- STÄRKE Windows and doors checked as they’re built, so a defect caught at the bench never becomes a defect on site. Manufacturing →
- Wilson Plumbing Rework cut by 80% by catching issues while they were still cheap to fix. Trades →
- CMP A $100m apartment block delivered 10 weeks ahead of schedule, with QA off the critical path. Trades →
-
Foodstuffs North Island Delivered four months ahead of schedule and under budget, with progress proven as it happened. Trades
- Heyday Sign-offs captured as the work happened, with nothing reconstructed from memory at close-out. Trades →
- AE Smith Thousands of sheets of paper per job, replaced by one record in one place. Trades →
-
Whitten & Andrews Photos only count as proof when they’re organised and accessible. Theirs file themselves against the work. Trades
- Sansom Proof captured at the point of work, ready the day the client asks instead of weeks after. Trades →
- SWP The record built as the work happened, so claims went in backed by evidence instead of arguments. Trades →
- AMP’T Evidence attached to the work itself instead of lost in threads and camera rolls. Trades →
- Salute QA that keeps pace with the build, so sign-offs don’t stall the program. Trades →