- 23 Nov 2026 A defect surfaces after handover and nobody can find the record When a builder reports a defect weeks after install, a tick sheet can't show what left your factory. Here's how Kalos Windows & Doors started keeping that record, and what it found.
- 21 Sep 2026 Excel and paper work until the record has to be defended Every contractor and every factory started QA on paper or in Excel. That is not a failure. A printed checklist and a spreadsheet with a tab per job are the cheapest QA system there is, and for a lot of work they are ...
- 17 Sep 2026 Your QA record is part of the bid, whether you meant it to be or not Most civil and infrastructure tenders, and most prequalification packs for precast and engineered-products supply, ask some version of the same question: what is your QA system? Most bidders answer it with a paragraph ...
- 14 Sep 2026 An ITP filled in at the end of the job is not a record. It's a reconstruction. ITP software In a survey we ran with the Civil Contractors Federation, 86% of engineers and supervisors said they spend five hours a week or more on QA and ITP admin. A lot of that time goes on rebuilding a record after ...